Werkstatt 1: Abschätzen Projektgröße Zyklus früh im Leben. Guidelines to set up a FP based model – Gathering supportive data (either Industry benchmarks or develop in-house baselines). FP221.
Datum und Uhrzeit: September 13 (09:00 – 13:00)
Moderator: Lori Limbacher
Moderator |
Lori Limbacher is a Senior Consultant with Premios, spezialisiert auf Software-Messung, process improvement and quality assurance. Ihre Spezialgebiete umfassen Funktionspunktanalyse, software project estimation, Festlegung von Messprogrammen, and software quality assurance. Lori is recognized as an international consultant, speaker and instructor. She focuses on helping organizations implement quality and productivity improvement programs utilizing measurement techniques, and she is an experienced instructor in change management, quality inspections, measurement and function point analysis. Certified Function Point Specialist – Fellow and a Certified SNAP Practitioner.
|
Abstrakt |
- Einführung
- Estimation Basics: Effective Estimating, What Is or Isn’t an Estimate, Accuracy versus Precision
- Estimation Techniques: Projektstruktur, Delphi, Parametric
- Parametric Estimation using FP and SNAP: Größe – FP and SNAP overview, Qualitative input, Delivery Rates (Historical data and/or Industry Benchmarks), Reporting and Data Collection
|
Zielgruppe |
Project managers, FP practitioners, business analysts, Kostenschätzer, software developers, QA specialists, metrics consultants, and anyone who needs to assess the size of their software. |
Sprache |
Englisch |
Kosten / Anmeldung |
Siehe ISMA14 Anmeldegebühr |